62-story mixed-use skyscraper redefining Chicago's skyline. Delivered 3 weeks early, zero safety incidents.
Longest cable-stayed bridge in the Pacific Northwest. 1.4 km span, opened 6 weeks ahead of schedule.
500 MW utility-scale solar facility across 3,200 acres. Powers 150,000 homes annually.
420-bed regional hospital with Level 1 trauma. Seismic Zone 4. Built within an occupied campus.
Intermodal hub connecting 3 transit modes. 80,000 daily passengers. Built above live rail lines.
Hyperscale 400 MW Tier IV data campus. Laser-guided FF55 floors. 99.9999% uptime design.
4-building academic precinct — 1,200-seat arts centre, STEM facility, 18,000 students.
Deep-water container terminal, 2.4M TEU capacity. Delivered during 24/7 live port operations.
Net-positive energy campus. Mass timber, 2.8 MW solar. Generates 108% of its own power.
440 MW, 110 turbines at 6,500 ft. Powering 190,000 homes across four states.
18 km expansion — 4 interchanges, 3 bridges, California's first highway wildlife crossing.
Let's talk about what you're building.