110 turbines across 22,000 Wyoming high-plains acres at 6,500 ft elevation, delivering 440 MW to a four-state grid — built in 22 months through sub-zero winters and 80 mph winds.
Extreme altitude and weather required heated concrete enclosures and wind-rated protocols for every operation.
High-plains construction methodology with just-in-time turbine delivery and heated pour systems engineered specifically for the site conditions.