Four interconnected Tier IV halls delivering 400 MW of total IT load, with rear-door liquid cooling, laser-guided FF55 floors, and a self-performed structured cabling programme across 800,000 sq ft.
Sub-millimetre floor flatness, EM shielding, anti-vibration foundations, and negotiating a dedicated 400 MW substation agreement in a constrained Texas grid.
Laser-guided concrete screeding achieved FF55/FL50 across the full site. Single-point MEP accountability from substation to rack eliminated interface risk.