Four landmark buildings by four different architects, delivered as one unified campus. A 1,200-seat performing arts centre, STEM research facility, student union, and graduate tower for 18,000 students.
Four design teams with distinct structural systems and MEP strategies — unified by ACG as master builder while preserving each architect's intent.
A single integrated BIM model enforced common grids and coordination. An ACG acoustic isolation system reduced airborne transmission in the arts centre by 94%.