A 420-bed Level 1 trauma centre designed to operate through a M9.0 seismic event, constructed entirely within a live hospital campus serving 300+ patients throughout the build.
Maintaining full infection-control protocols and zero disruption to critical care pathways while constructing at pace within an occupied facility.
Phased swing-space strategy with all MEP prefabricated offsite in sanitary conditions, eliminating construction dust from clinical areas entirely.