Projects / Ridgeline Wind Farm
Sustainable

Ridgeline Wind Farm

Location
Cheyenne, WY
Year
Completed 2019
Project Value
$680M
Scale
22,000 acres
Certification
Utility Scale
440MW
Capacity
110
Turbines
22K
Acres
190K
Homes
22
Months
6,500ft
Elevation
Overview

About This Project

110 turbines across 22,000 Wyoming high-plains acres at 6,500 ft elevation, delivering 440 MW to a four-state grid — built in 22 months through sub-zero winters and 80 mph winds.

Photography
Ridgeline Wind Farm
The Challenge

What We Were Up Against

Extreme altitude and weather required heated concrete enclosures and wind-rated protocols for every operation.

Our Solution

How We Delivered

High-plains construction methodology with just-in-time turbine delivery and heated pour systems engineered specifically for the site conditions.

Project Tags
Wind Renewable Utility Scale High Plains
Project Specifications
Client GreatPlains Wind Energy
Location Cheyenne, WY
Year Completed 2019
Duration 22 months
Value $680M
Scale 22,000 acres
Sector Sustainable
Cert. Utility Scale
Discuss a Similar Project → ← All Projects
Keep Exploring

Related Projects

Buildings // Civil Infrastructure // Industrial // Sustainable Build // Healthcare // Technology // 48 Years Strong // 100% Employee Owned // Safety Excellence // Design-Build // BIM // Zero Incidents // Buildings // Civil Infrastructure // Industrial // Sustainable Build // Healthcare // Technology // 48 Years Strong // 100% Employee Owned // Safety Excellence // Design-Build // BIM // Zero Incidents // Buildings // Civil Infrastructure // Industrial // Sustainable Build // Healthcare // Technology // 48 Years Strong // 100% Employee Owned // Safety Excellence // Design-Build // BIM // Zero Incidents //